r/saskatoon • u/SanFull • 4d ago
Chief Mistawasis bridge and roadway Traffic/Road Conditions 🚧
We drove from the north end to Evergreen Square this afternoon while it was snowing. The bridge and roadway, which is maintained by Graham Construction, was plowed and sanded, we passed the plow truck. As soon as we got to the city’s part of the MacOrmond…. Snow piling up, not a spot of gravel or sand, definitely no plow!
31 Upvotes
12
u/steveyxe69 East Side 3d ago
They also maintain Central north of Attridge, its always mint,both the road and the sidewalk, bike paths on both sides. Then I turn onto Fedoruk, maintained by the city and it's a lane and 3/4 and the sidewalk is done a week after it snows